{"id":985,"date":"2016-10-28T15:43:02","date_gmt":"2016-10-28T19:43:02","guid":{"rendered":"https:\/\/newwestschools.ca\/archive_241212\/\/?page_id=985"},"modified":"2020-04-30T21:58:08","modified_gmt":"2020-05-01T04:58:08","slug":"consultation","status":"publish","type":"page","link":"https:\/\/newwestschools.ca\/archive_241212\/nwss-replacement-project\/consultation\/","title":{"rendered":"Construction Notices"},"content":{"rendered":"<h2>New Westminster Secondary School Replacement Project<\/h2>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-9391 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/thumbnail_New-NWSS_19x14_Grand-Plaza_Web-640-300x223.jpg\" alt=\"\" width=\"300\" height=\"223\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/thumbnail_New-NWSS_19x14_Grand-Plaza_Web-640-300x223.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/thumbnail_New-NWSS_19x14_Grand-Plaza_Web-640-200x150.jpg 200w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/thumbnail_New-NWSS_19x14_Grand-Plaza_Web-640.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>\n<h3>Construction Notices<\/h3>\n<p>We are now in the construction phase of our New Westminster Secondary School Replacement Project \u2013 a $106.5 million, state-of-the-art new home for one of British Columbia\u2019s largest high schools!<\/p>\n<p>Our future New Westminster Secondary School will accommodate 1,900 grade 9 to 12 students in a 21st century learning environment. That meets today\u2019s standards for modern learning, safety and accessibility, while incorporating the latest sustainable energy management systems.<\/p>\n<p>If you would like to be added to our notification email list to receive construction and project updates, please provide your email\u00a0<a href=\"mailto:newnwss@sd40.bc.ca\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a>.<\/p>\n<hr \/>\n<h3>Construction Updates<\/h3>\n<p>New Westminster Schools and the Ministry of Education selected\u00a0Graham Design-Builders\u00a0with\u00a0KMBR Architects Planners Inc.\u00a0to design and build the new school. Please note the construction notices below.<\/p>\n<hr \/>\n<h3>April 30, 2020<\/h3>\n<p>Due to COVID-19 related issues, we\u2019re disappointed to share the news that the replacement building under construction at New Westminster Secondary School will not be ready for the previously projected opening. Click here to learn more: <a href=\"https:\/\/newwestschools.ca\/archive_241212\/nwss-delay-of-completion\/\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/newwestschools.ca\/archive_241212\/nwss-delay-of-completion\/<\/a><\/p>\n<hr \/>\n<h3><strong>July 24, 2019: Underground utilities upgrade between Massey Theatre and Moody Arena<\/strong><\/h3>\n<p>As part of the New Westminster Secondary School Replacement Project, the contractor Graham Design Builders LP is progressing with the installation of new underground utilities (drainage, sanitary and water) between Massey Theatre and Moody Arena.<\/p>\n<p><strong>Work Procedure<\/strong><\/p>\n<ul>\n<li>Excavation of trenches<\/li>\n<li>Installation and connection of new underground lines to existing buildings and up to existing line on 8<sup>th<\/sup><\/li>\n<li>Backfill and asphalt restorations<\/li>\n<\/ul>\n<p><strong>What to Expect<\/strong><\/p>\n<ul>\n<li>Partial closure of drive aisles<\/li>\n<li>Reduction of parking spaces on drive aisles between Massey Theatre and Moody Arena<\/li>\n<li>Presence of Traffic Control Person during working hours<\/li>\n<li>24\/hr. signage in place to assist public access to both facilities<\/li>\n<li>Trucks and excavation equipment stationed on the site.<\/li>\n<\/ul>\n<p><strong>Start Date:<\/strong> July 11, 2019<\/p>\n<ul>\n<li>Estimated duration of works: 4 Months<\/li>\n<\/ul>\n<p><strong>Work Hours<\/strong>:<\/p>\n<ul>\n<li>Monday: 7:00 a.m. to 5:00 p.m.<\/li>\n<\/ul>\n<p><strong>Contact: <\/strong><\/p>\n<ul>\n<li><strong>\u00a0<\/strong>Email: newnwss@sd40.bc.ca<\/li>\n<\/ul>\n<hr \/>\n<h3>July 19, 2019: Summer work ramps up<\/h3>\n<figure id=\"attachment_16261\" aria-describedby=\"caption-attachment-16261\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16261 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-picture-1-1-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-picture-1-1-300x225.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-picture-1-1-200x150.jpg 200w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-picture-1-1.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-16261\" class=\"wp-caption-text\">June 24: The Career Technology Education and Arts areas begin to take shape<\/figcaption><\/figure>\n<p>As the summer proceeds, construction on the New Westminster Secondary School replacement project continues with nearly double the workers, at 125-150, on site since the end of June. They represent a variety of trades \u2013 from mechanical and electrical to plumbing and air exchange ducting &#8211; as work ramps up over the summer. \u00a0Construction also began in June on the Maintenance and Information Technology building on \u2018site B\u2019 to the north of the Massey Theatre.\u00a0 By early summer, the shape of the school\u2019s interior spaces were increasingly evident, particularly on the main floor\u2019s Career Technology Education area as walls and mechanical systems are being installed. The project is now closing in on less than 300 days to substantial completion.<\/p>\n<p>The school district\u2019s Design-Build contractor, Graham Construction, manages the project work and provides the school district with monthly updates. All notification from Graham Construction to New Westminster Schools has confirmed the project continues to proceed on budget and on schedule.<\/p>\n<figure id=\"attachment_16264\" aria-describedby=\"caption-attachment-16264\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16264 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-Green-640-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-Green-640-300x225.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-Green-640-200x150.jpg 200w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/07\/ABCD-Green-640.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-16264\" class=\"wp-caption-text\">June 24 &#8211; another angle on the Career Technology Education area&#8230;<\/figcaption><\/figure>\n<p>Given the complexity of the NWSS replacement site and its history of multiple uses (from a former army barracks to expired city works), unforeseen site conditions, along with weather conditions and other factors, do arise.\u00a0 In the past week, for instance, a number of abandoned sewer lines were discovered on site. In such instances, the contractor is able to take steps to mitigate issues and lessen potential delays by, for example, increasing resources on the project or modifying design details.<\/p>\n<p>Construction is proceeding and the contractor is continuing to pursue the targeted substantial completion date of May 6, 2020.\u00a0 The expectation is that the building will be at the lock-up stage by winter (with exterior work completed and the focus turning to interior fitting), and that the school will be ready for occupancy in September 2020, said Dave Crowe, Director of Capital Projects.<\/p>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-14652\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/03\/IMG_4595-2.jpg\" alt=\"\" width=\"790\" height=\"465\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/03\/IMG_4595-2.jpg 640w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2019\/03\/IMG_4595-2-300x177.jpg 300w\" sizes=\"auto, (max-width: 790px) 100vw, 790px\" \/>\n<hr \/>\n<h3>March 20, 2019: New School rising: Massive teamwork and a 429-day countdown&#8230;<\/h3>\n<p>The evidence is in and it\u2019s unmistakable: one of the largest and most up-to-date learning environments in the province is rising up and out of the ground as the seismic replacement for New Westminster Secondary School becomes reality.<\/p>\n<p>With a 429-day countdown to completion as of yesterday, the two-block worksite is a hive of activity.<\/p>\n<p>This week, some 20 truckloads carrying a total of 182 cubic metres of concrete will be delivered to the site; the material is being poured (using a \u2018slab-on-grade\u2019 approach) for the school\u2019s huge gym floor \u2013 which is the size of three side-by-side gymnasiums.<\/p>\n<p>Over on the east wing, roof trusses and cross-bracing are appearing above the three-storey school\u2019s top floor \u2013 a design factor in the $106.5 million new school\u2019s earthquake resistance capabilities.<\/p>\n<p>As the school district\u2019s Dave Crowe, Director of Capital Projects describes it: \u201cIt\u2019s a huge project and a massive team effort \u2013\u00a0 the equivalent of building five regular schools simultaneously.\u201d<\/p>\n<p>See more <a href=\"https:\/\/newwestschools.ca\/archive_241212\/new-school-rising-massive-teamwork-and-a-429-day-countdown\/\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a>.<\/p>\n<hr \/>\n<h3>Construction Updates 2018<\/h3>\n<h3><\/h3>\n<h3>Nov. 16, 2018: 552 Days: The countdown to a new high school begins<\/h3>\n<p>As of November 16, 2018,\u00a0 it was 552 days to the finish line in completing a replacement for New Westminster Secondary School. &#8220;We&#8217;re on budget and on schedule,&#8221; said Grant Lachmuth, Chief Project Officer for the New Westminster Secondary School Replacement Project&#8230;See <a class=\"tlink\" href=\"https:\/\/newwestschools.ca\/archive_241212\/552-days-the-countdown-to-a-new-high-school-begins\/\">more.<\/a><\/p>\n<img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-12906\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2018\/11\/IMG_7641-1.jpg-640-1.jpg\" alt=\"\" width=\"790\" height=\"393\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2018\/11\/IMG_7641-1.jpg-640-1.jpg 640w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2018\/11\/IMG_7641-1.jpg-640-1-300x149.jpg 300w\" sizes=\"auto, (max-width: 790px) 100vw, 790px\" \/>\n<hr \/>\n<h3>Aug. 1, 2018:\u00a0 Notification of Periodic Partial Closures on 6th Street starting Aug. 22 for an estimated 3 days<\/h3>\n<p>Graham Design Builders LP will be installing a new underground water main line starting from 6th Street, crossing the NWSS replacement project construction site area and connecting to the existing lines in the Massey Theater driveway. This will result in periodic partial closures affecting 6th Street for an estimated duration of 3 days as described below:<\/p>\n<p><strong>Start Date:\u00a0<\/strong><\/p>\n<ul>\n<li>Aug. 22, 2018<\/li>\n<\/ul>\n<p><strong>Work Procedure:<\/strong><\/p>\n<ul>\n<li>excavation of trenches<\/li>\n<li>installation of the new water pipe<\/li>\n<li>backfill, asphalt and sidewalk restorations<\/li>\n<\/ul>\n<p><strong>What to Expect:\u00a0<\/strong><\/p>\n<ul>\n<li>periodic closure of the west sidewalk at 6th Street<\/li>\n<li>partial closure of one traffic lane on 6th Street<\/li>\n<li>reduction of parking spaces on 6th Street in the adjacent work area (15 parking stalls in the east side; 8 parking stalls in the west side).<\/li>\n<li>presence of a traffic control person during working hours<\/li>\n<li>24\/hour signage in place<\/li>\n<li>trucks and excavation equipment stationed on the site<\/li>\n<\/ul>\n<p><strong>Estimated Duration of works:<\/strong><\/p>\n<ul>\n<li>A total of three days:\n<ul>\n<li>Day 1: traffic set-up and excavation<\/li>\n<li>Day 2: water line installation and backfill<\/li>\n<li>Day 3: Asphalt patching and street reopening<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><strong>Work Hours:<\/strong><\/p>\n<ul>\n<li>Monday to Friday: 7 a.m. to 5 p.m.<\/li>\n<\/ul>\n<hr \/>\n<h3>July 20, 2018: \u00a0Site service work will impact lane access between Moody Park Arena and Massey Theatre from July 23 through August<\/h3>\n<p>Excavation and installation of new underground sewer, water and sanitary lines is proceeding in a westerly direction along the school construction site and as of July 23, will begin in a southerly direction between the Moody Park Arena and Massey Theatre toward Eight Avenue. This will lead to reduced access through the laneway between the Moody Park Arena and the Massey Theatre starting Monday and continuing through August. Traffic management plans will accommodate ongoing access. In order to avoid unexpected delay, the public is encouraged to access parking and to conduct drop-off and pick-up activity using laneway access from 10<sup>th<\/sup> Avenue.<\/p>\n<p>Bulk excavation continues through August as organic materials are removed from the 10,000 square-metre site in preparation for the \u2018detail excavation\u2019 phase, which will confirm the accurate ground-point for the foundation of the school.\u00a0 Auger drilling is proceeding. Minimal noise is associated with this activity. A drilling rig using hydraulic equipment will spiral 220 augers into the ground to varying depths, a process that will underpin the foundation of the new school. This work will also continue through August.<\/p>\n<hr \/>\n<h3>June 30, 2018: \u00a0Site establishment\u00a0work\u00a0continues through the month of July<\/h3>\n<div class=\"_rp_l5\">\n<div class=\"_rp_i5\">\n<div class=\"_rp_j5 rpHighlightAllClass rpHighlightBodyClass allowTextSelection\" role=\"region\" aria-label=\"Message body\">\n<div id=\"Item.MessageNormalizedBody\" class=\"_rp_k5 ms-font-weight-regular ms-font-color-neutralDark\" tabindex=\"-1\" role=\"presentation\">\n<div class=\"rps_955f\">\n<div lang=\"EN-US\">\n<div class=\"x_WordSection1\">\n<p class=\"x_MsoNormal\">Excavation and installation of new underground sewer, water and sanitary site services will continue through the month of July, with the work extending now from Sixth Street to the building site. Impact on traffic is minimal. A traffic management plan is in place and consists of flagging on Sixth Street as trucks turn left only upon leaving the site. The sidewalk is partially closed.<\/p>\n<p class=\"x_MsoNormal\">Bulk excavation also continues through the next three weeks of July as organic materials are removed from the 10,000 square-metre site in preparation for the \u2018detail excavation\u2019 phase, which will confirm the accurate ground-point for the foundation of the school.\u00a0The demolition of the skateboard park is now complete, and was finalized mid-last week.<\/p>\n<p class=\"x_MsoNormal\">Auger-pile\u00a0drilling is proceeding. Minimal noise is associated with this activity. A drilling rig using hydraulic equipment is spiraling 220 auger-piles into the ground to varying depths, a process that will underpin the foundation of the new school. This work will also continue through the month of July.<\/p>\n<hr \/>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h3>June 15, 2018: \u00a0Civil works ahead of schedule<\/h3>\n<p>Underground civil works on Sixth Street have progressed well and are ahead of schedule. As a result, Sixth Street will be fully open to traffic, with an end to\u00a0partial road closures in the coming week.<\/p>\n<p>A drilling rig is now situated on site in preparation for the installation of a series of 220 auger-piles that will be spiraled into the ground to varying depths, a process that will underpin the foundation of the new school. This work involves the use of hydraulic equipment. The activity\u00a0is\u00a0scheduled to begin June 21 and will run for several weeks. Expect\u00a0minor noise.<\/p>\n<p>Also scheduled to begin\u00a0June 21 is the tentative removal of half a dozen trees\u00a0in accordance with the City of New Westminster&#8217;s tree protection protocols.<\/p>\n<hr \/>\n<h3>June 8, 2018: \u00a0Civil works continue on Sixth Street<\/h3>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-11264\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/A-NWSS-Groundbreaking.jpg\" alt=\"\" width=\"400\" height=\"235\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/A-NWSS-Groundbreaking.jpg 640w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/A-NWSS-Groundbreaking-300x176.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/>The New Westminster Schools Replacement Project team thanks residents and visitors for their patience as Graham Construction continues with civil works starting at Sixth Street and requiring trucks to turn left only upon leaving the site. The process of installing a new line of underground services for storm water, sanitary and water main lines will continue to require occasional single lane traffic over the next two to three weeks. Residents can also expect partial closures of the west sidewalk at Sixth Street. The work procedure involves excavating trenches, installing new pipes and restoring the sidewalk, backfill, and asphalt.<\/p>\n<p>Mechanical demolition of the skateboard park is scheduled to begin June 14 and is expected to last seven working days. The demolition will entail moderate noise associated with the use of a concrete saw. Ongoing activities continuing over the 18,000-square-metre construction site include removal of organic materials and detail <img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-11265\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/B-NWSS-Groundbreaking.jpg\" alt=\"\" width=\"400\" height=\"242\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/B-NWSS-Groundbreaking.jpg 640w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/B-NWSS-Groundbreaking-300x181.jpg 300w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/>excavation to level the site in preparation for the new school. Preparation for the installation of steel anchor posts is expected to begin June 18; the posts will ensure the new school meets seismic regulations.<\/p>\n<p>An official groundbreaking ceremony was held on site May 25 that included the Minister of Education Rob Fleming, as well as grade 9 student representatives who will be among the first to graduate from the new high school after it is completed in September 2020.<\/p>\n<p>The related New Westminster Record story is here: <a href=\"https:\/\/bit.ly\/2KWGKzs\">https:\/\/bit.ly\/2KWGKzs<\/a>.<\/p>\n<hr \/>\n<h3>May 25, 2018: Notification of Underground Service Relocation<\/h3>\n<p class=\"x_MsoNormal\">As part of the New Westminster Secondary School Replacement Project, the contractor Graham Design Builders LP will be installing a new line of underground services (new storm water, sanitary, and water main lines) starting Monday, May 28<sup>th<\/sup>, 2018.\u00a0 The installation will start at the 6<sup>th<\/sup>\u00a0Street entrance to the construction site and cross the construction site area to connect to the existing lines in the Massey Theatre driveway.<\/p>\n<h4 class=\"x_MsoNormal\"><strong>Work Hours:<\/strong><\/h4>\n<ul>\n<li class=\"x_MsoNormal\">Monday to Friday from 7:00 a.m. to 5 p.m.<\/li>\n<\/ul>\n<h4><strong>Estimated duration of works is expected to take 10 weeks as follows:<\/strong><\/h4>\n<ul>\n<li class=\"x_MsoNormal\">4 weeks will entail work activity in 6<sup>th<\/sup>\u00a0street<\/li>\n<li>6 weeks will take place inside the construction site area with no road or sidewalk closure.<\/li>\n<\/ul>\n<h4 class=\"x_MsoNormal\"><strong>The work procedure will involve:<\/strong><\/h4>\n<ul>\n<li class=\"x_MsoNormal\">\u00a0excavation of trenches<\/li>\n<li>\u00a0installation of new pipes and manholes<\/li>\n<li>\u00a0backfill, asphalt and sidewalk restorations<\/li>\n<\/ul>\n<h4><strong>Residents can expect:<\/strong><\/h4>\n<ul>\n<li class=\"x_MsoListParagraph\">periodic closure of west sidewalk at 6th Street<\/li>\n<li>partial closure of one traffic lane on 6th Street<\/li>\n<li>reduction of parking spaces on 6th street in the adjacent work area<\/li>\n<li>presence of a traffic control person during working hours<\/li>\n<li>24\/hr signage in place<\/li>\n<li>trucks and excavation equipment stationed on the site<\/li>\n<\/ul>\n<hr \/>\n<h3>May 10, 2018: Demolition of Mercer Stadium Skatepark<\/h3>\n<p>During any deconstruction, it is common practice to identify the conditions of the materials for disposal. The contractor at the replacement project site embarked on testing of the surface materials as well as the concrete itself prior to demolition of the Mercer Stadium skatepark.\u00a0 Preliminary testing four to five days ago confirmed there is no asbestos in the concrete but indicated trace amounts of lead associated with some of the sub-surface layers of graffiti paint on the site, prompting further tests. As a result of the findings, the contractor is following<b>\u00a0<\/b>safety and government procedures in proceeding with the demolition of the site, as prescribed by WorkSafe BC and government environmental and hazardous waste regulations. The mechanical demolition is now scheduled to begin May 16 and continue through to May 29, 2018. In other activity, foundation work will begin with the removal of organic materials from the site starting May 14, and continuing over a period of several weeks.<\/p>\n<hr \/>\n<h3><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-10490 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6251-640-cropped-300x188.jpg\" alt=\"\" width=\"300\" height=\"188\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6251-640-cropped-300x188.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6251-640-cropped.jpg 585w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong>April 30, 2018: Minor traffic control measures now in place<\/h3>\n<p>As a result of revised priorities, the date for the mechanical demolition of the Mercer Park skateboard park has been moved to May 7.\u00a0 In moving forward with site excavation, traffic management plans are now in place. Local drivers are seeing construction notices and flagging on Sixth Street controlling exits around the site as trucks turning right only leave the site. Expect some minor delays as measures ensure vehicle traffic can safely exit the site.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-10495 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6236-640-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6236-640-300x200.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_6236-640.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>In addition, signage is in place on Eighth Street and Eighth Avenue clarifying parking arrangements for patrons of Massey Theatre. Patrons with mobility issues are directed to clearly designated stalls behind the Massey Theatre; the general public is directed to appropriate parking stalls in the New Westminster Secondary School parking lot to the North.<\/p>\n<hr \/>\n<h3>April 20, 2018:\u00a0 Skatepark Demolition Starts Next Week<\/h3>\n<p>Eight days are scheduled for the mechanical demolition of the Mercer Stadium Skatepark starting April 25 following a weather-related delay last week. Moderate noise will be associated with the use of a concrete saw.\u00a0 For updates on the\u00a0City of New Westminster&#8217;s\u00a0plans for a new Destination Skatepark, click <a href=\"http:\/\/www.newwestcity.ca\/skatepark\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a>.\u00a0 Also on April 25, site establishment work involving shallow excavation will begin, weather permitting.<\/p>\n<hr \/>\n<h3>April 13, 2018: Weather Impacts<\/h3>\n<p>The weather is always a factor in construction projects &#8211; and the week from April 8 to 12 saw\u00a0a delay in the process of site stripping and shallow excavation due to heavy rains\u00a0and site saturation.\u00a0 However, site establishment work\u00a0is\u00a0scheduled to continue through the month of April.\u00a0 At this stage, the delivery and set-up of construction trailers has been completed.\u00a0\u00a0In the coming week \u2013 weather permitting \u2013 the demolition of the Mercer Stadium skatepark will begin and\u00a0is expected to continue through to April 20.<\/p>\n<hr \/>\n<h3><strong><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-10161 size-medium\" src=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_4155-640-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_4155-640-300x200.jpg 300w, https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2016\/10\/IMG_4155-640.jpg 640w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/strong>Mercer Stadium Skatepark Closed as of April\u00a03, 2018<\/h3>\n<p>Construction of the new school is now underway. Mercer Stadium Skatepark will be closed for demolition starting Tuesday, April 3, 2018.\u00a0For updates on the\u00a0City of New Westminster&#8217;s\u00a0plans for a new Destination Skatepark, click <a style=\"font-weight: 300;\" href=\"http:\/\/www.newwestcity.ca\/skatepark\" target=\"_blank\" rel=\"noopener noreferrer\">here<\/a><span style=\"font-weight: 300;\">.<\/span><\/p>\n<p>This phase of construction will include site condition preparations, protection of trees on the site perimeter, and removal of the upper layer of top soil (\u2018site stripping\u2019) prior to work. Trailers for first-aid, storage and office support will be set up between April 9 to 17.<\/p>\n<p>Impacts at this time will include moderate noise associated with mechanical demolition of the skatepark between April 3 and April 13, as well as low noise from excavation activities associated with site preparation work. Minor traffic disruption, mainly in the laneway, can be expected between April 9 to 17 in relation to trailer set-up.<\/p>\n<p>Please note that the Massey Theatre is expected to remain fully operational throughout the construction phase of the New Westminster Secondary School Replacement project.<\/p>\n<pre><a href=\"https:\/\/newwestschools.ca\/archive_241212\/wp-content\/uploads\/2018\/03\/NWSS_Construction-Notice-Fencing-and-Geotech-March-6-2018.pdf\">Notification of Site Fencing and Geotechnical Investigation<\/a>, March 6, 2018<\/pre>\n","protected":false},"excerpt":{"rendered":"<p>New Westminster Secondary School Replacement Project Construction Notices We are now in the construction phase of our New Westminster Secondary School Replacement Project \u2013 a $106.5 million, state-of-the-art new home [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":239,"menu_order":1,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-985","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/pages\/985","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/comments?post=985"}],"version-history":[{"count":138,"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/pages\/985\/revisions"}],"predecessor-version":[{"id":19750,"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/pages\/985\/revisions\/19750"}],"up":[{"embeddable":true,"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/pages\/239"}],"wp:attachment":[{"href":"https:\/\/newwestschools.ca\/archive_241212\/wp-json\/wp\/v2\/media?parent=985"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}